日韩在线视频不卡一区二区-av中文字幕手机在线观看网址-91久久人妻中文字幕va-日韩 欧美 在线 第一页-国语精品91自产拍在线观看不卡-国产av乳头久久一区-999re这里只有精品视频-国产精品九九在线免费观看-日本熟妇人妻影片精选,久久精品日日躁夜夜躁91 ,精品人妻一区二区三区在线看,国产麻豆欧美视频在线观看

產(chǎn)品目錄 CATALOG

要求報(bào)價(jià)

為方便我們公司員工進(jìn)行聯(lián)系,請(qǐng)?zhí)顚懴卤恚?/span> 以下為必填項(xiàng)

以下為選填項(xiàng)

產(chǎn)品展示 PRODUCTS 當(dāng)前位置:首頁 > 定硫儀(測硫儀)系列 > (英)KZDL-8A型快速智能定硫儀操作規(guī)程

(英)KZDL-8A型快速智能定硫儀操作規(guī)程

  • 型   號(hào):KZDL-8A型
  • 類   別:定硫儀(測硫儀)系列
  • 產(chǎn)   地:鶴壁市

更新時(shí)間:2025-09-25
點(diǎn)擊次數(shù):2895次

快速智能定硫儀安裝:打開包裝箱,儀器包括控制器,爐體和凈化吸收器三部分。

 一、儀器安裝
I. Instrument Installation

打開包裝箱,儀器包括控制器,爐體和凈化吸收器三部分:
Open the packing case, you will see the three parts of the instrument, i.e. controller, furnace body and purification absorber.

1、安裝爐體部分,首先安裝硅碳管、兩個(gè)金屬片要離硅碳管邊有3mm,金屬片中間墊有兩個(gè)瓷片,一定要靠中間,目的是防止短路和損壞硅碳管。

1、Furnace body installation: First install the silicon carbide tube. Be sure that the two sheet metals are 3mm away from the edge of silicon carbide tube. Put two ceramic pads in the middle of the sheet metal for preventing short circuit and silicon carbide tube damage. 

螺絲上的瓷片要放好,否則會(huì)短路。然后緊固螺絲,兩邊的螺絲要同步擰緊,保持兩邊間隙一致,螺絲的松緊一定掌握好,太松容易打火,太緊容易擰爛硅碳管。最好使用一個(gè)月再緊固一下,或者金屬片中間再加個(gè)螺絲帽。然后將兩個(gè)硅碳管連線擰上,用螺絲帽固定緊。如果絕緣瓷碗較松,要把線皮擰一下,將瓷碗頂緊沒有間隙。避免裸露銅線漏電。
Correctly position the ceramic pads of the screw, or else short circuit may be caused. Then fasten the screw. The screws on both sides shall be simultaneously fastened with the same space kept. The degree of screw tightness must be proper. If too loose, sparking may occur, if too tight, the silicon carbide tube may break. The best practice is to refasten them after one month of use, or add a screw cap between the sheet metals. Then screw the wires of the two silicon carbide tubes and secure them with screw cap. If the insulation bowl is loose, screw the wire to tighten it until there is no space. Avoid bare copper wire from electric leakage.

2、把左側(cè)圓形擋片取下,看爐體內(nèi)是否有雜物,清潔干凈。然后將硅碳管送入爐體內(nèi),推到頭后其實(shí)沒有到位,要抬一下,使硅碳管再進(jìn)去一點(diǎn)兒上了臺(tái)階才算安裝到位。把左側(cè)擋片安裝上,緊固螺絲時(shí),要同時(shí)晃動(dòng)硅碳管,防止卡住硅碳管,將硅碳管擠爛。4條螺絲都擰緊后,保證硅碳管還是可以活動(dòng)的。然后插入異經(jīng)管,同樣抬一下,使異經(jīng)管再進(jìn)去一點(diǎn)兒上了臺(tái)階。再緊固左側(cè)的固定螺絲,固定異經(jīng)管。還要注意右側(cè)送樣口異經(jīng)管與爐體本身是否一致,不要錯(cuò)位,否則做實(shí)驗(yàn)時(shí)送樣容易卡住。
2、Take down the left round shied to see whether there are sundries in the furnace body and whether it is clean. Then feed the silicon carbide tube into the furnace body until it can not move forward. Then slightly lift it up to movie it inward more until it is on a step. Then install the left shied and fasten its screw while shaking the silicon carbide tube to prevent blocking and breaking the latter. Ensure that after 4 screws are tightened, the silicon carbide tube is also movable. Then insert the reducing pipe, also slightly lift it up to move it inward more onto the step. Then fasten the left retaining screw to secure the reducing pipe. Also pay attention that whether the reducing pipe at right feed port is consistent with the furnace body itself. Avoid dislocation, or the sample may be blocked in the experiment.

把熱電偶的連線接好,將熱電偶的幾個(gè)螺絲都擰緊,再將熱電偶插入爐體中間的熱電偶孔內(nèi),用手抬一下硅碳管,看熱電偶是否會(huì)動(dòng),如果沒有動(dòng),說明沒有插到位。最后將插到位的熱電偶退回1mm。緊固螺絲固定好熱電偶。
Connect the wire of thermocouple and screw the several screws of the thermocouples tight. After that, insert the thermocouple into the thermocouple hole in the furnace body. Then lift the silicon carbide tube by hand to see whether the thermocouple moves. If not, it means the thermocouple is not in place. At last, after it is in place, draw it back for 1mm. Fasten the screw to secure it.

3、安裝凈化器和電解池,注意膠管的連接順序,異經(jīng)管和兩通閥之間用硅膠管連接,兩通閥最好用凡士林涂抹,密封更好。兩通閥連接電解池其中一個(gè)有溶板的接口,另一個(gè)口連接凈化器上。電解池底部接口連上一截膠管,并用止水夾夾住。凈化器上左邊兩個(gè)干燥管上下兩端堵上脫脂棉,中間放入變色硅膠,將膠塞擰緊,不要漏氣。
3、Installation of purifier and electrolytic tank: Pay attention to the connection order of rubber tubes. The reducing pipe and two-way valve are linked with silicone tube. It would be best to apply vaseline over the two-way valve, so that it will be sealed better. Connect the two-way valve with one of connector with solution plate of the electrolytic tank at one way, and with the purifier at the other way. The bottom port of the electrolytic tank is connected with a section of rubber tube and clamped with a water sealing clip. Both ends of the two drying tubes on the left of purifier are plugged with degreasing cotton with allochroic silicagel in the middle. Screw the rubber plug tight to avoid air leakage.

4、配制電解液:稱取5克碘化鉀、5克溴化鉀、溶于250~300毫升蒸餾水中,再加入10毫升冰乙酸攪拌至完全溶解即可。電解液可重復(fù)使用,當(dāng)PH<1需重新配制。
Preparation of electrolyte: Take 5g of potassium iodide and 5g of potassium bromide, dissolve both in 250~300mlof distilled water. Then add 10 ml of glacial acetic acid into the solution, mix them until they are completely dissolved. The electrolyte may be used repeatedly. It shall be re-prepared in case of PH<1.

 二、操作步驟
Ⅱ 、Operating steps

1、升溫:打開儀器右邊送樣窗口,合上電源開關(guān),打印機(jī)自檢,送樣電機(jī)自動(dòng)復(fù)位,處待命狀態(tài)。儀器便自動(dòng)升溫(不用手工調(diào)節(jié)),初次使用最好使?fàn)t溫升到800℃時(shí)恒溫30min(請(qǐng)使用面板“控溫”鍵),關(guān)掉電源開關(guān),冷卻到室溫。再重新開機(jī),升到工作溫度1050℃。
1、Warming up: Open the feed window on the right side of the instrument and switch on. Then the printer will check itself and the feed motor will reset automatically to be on standby. The instrument will warm up automatically (without manual adjustment). For first use, it would be best to let the furnace warm up to 800℃and keep the temperature for 30min (please use the“Temperorature control” key on the panel. ). Then switch off and let the furnace cool to the room temperature. Start the instrument again and let the furnace warm up to the operating temperature of 1050℃.

2、倒入或吸入電解液,打開二通閥,氣泵,調(diào)節(jié)流量計(jì)達(dá)到1000毫升/分,打開攪拌器,緩慢調(diào)節(jié)轉(zhuǎn)速到融板所出的氣泡與電解液完全混合均勻即可,儀器進(jìn)入待實(shí)驗(yàn)狀態(tài)。
2、Pour into or absorb electrolyte. Open the two-way valve and air pump. Adjust the flowmeter to 1000 ml/min.. Open the mixer and slowly adjust its rotating speed until the bubbles from solution plate are fully mixed with the electrolyte. Then the instrument enters the status of ready for experiment.

3、在瓷舟中稱取50mg±0.2mg左右混合均勻的試樣,于煤樣上鋪蓋一薄層三氧化鎢,將瓷舟放入石英托盤上,打開 “電解開關(guān)”,按“啟動(dòng)”鍵,輸入三位數(shù)樣重(小數(shù)點(diǎn)不用輸入),再按“啟動(dòng)”鍵,試樣自動(dòng)被送入燃燒爐,分別在500℃和1050℃處停留已設(shè)定好的時(shí)間,自動(dòng)返回,自動(dòng)打印,整個(gè)實(shí)驗(yàn)過程由程序自動(dòng)執(zhí)行。

3、Take about 50mg±0.2mg of uniformly mixed sample from the porcelain boat. Cover a thin layer of tungsten trioxide over the coal sample. Put the porcelain boat on the quartz tray. Open“Electrolytic switch”press"start" key, input three-digit sample weight (no need to input digits after the decimal point), press"start" key again, the sample will be sent to combustion furnace again. Remain at 500℃and 1050℃respectively for the set durations. After then, return and print automatically. The whole experiment is executed by procedure automatically.  

4、用鑷子(勿用手)取下瓷舟,重復(fù)步驟3進(jìn)行第二個(gè)樣試驗(yàn)。

注意:〈1〉每次試驗(yàn)前必須做幾個(gè)廢樣,使電解液達(dá)到平衡,即右顯示窗開始計(jì)數(shù)為止,也就是在正式測試試樣之前所作的廢樣結(jié)果不是零才可以。
Take down the porcelain boat with tweezers (not by hand). Repeat step 3 for the second sample

Note: 〈1〉Prepare several waste samples before each test to balance the electrolyte, i.e. the right display window becomes to count, that is to say, the waste sample result is not zero before normal sample testing.

〈2〉實(shí)驗(yàn)時(shí)"電解開關(guān)"必須打開,否則,永遠(yuǎn)不會(huì)電解。嚴(yán)禁在電解液攪拌狀態(tài)關(guān)閉下打開“電解開關(guān)”。只有在攪拌時(shí)才可。否則會(huì)污染電極,影響測試精度。
〈2〉During experiment, the“electrolytic switch” must be switched on, or no electrolysis will occur. It is prohibited to switch on the“electrolytic switch” when the electrolyte mixing is closed. It can only be switched on when the electrolyte is being mixed. Or else, it will pollute the electrode and affect the test precision.

〈3〉試驗(yàn)最好連續(xù)進(jìn)行,如中間間隔時(shí)間太長,在做試樣前應(yīng)加燒一個(gè)廢樣。
〈3〉It would be best to carry out the test continuously. If there is a long interval between two tests, an additional waste sample shall be burnt before the latter test.

〈4〉 、實(shí)驗(yàn)結(jié)束,按“電解開關(guān)”鍵,關(guān)掉電解,關(guān)閉二通閥、攪拌器、氣泵,放出電解液(最好保存在棕色磨口瓶內(nèi))以備下用。用蒸餾水洗凈電解池,關(guān)掉電源開關(guān)。
〈4〉 、After the experiment is over, press the“electrolytic switch”and close electrolysis, two-way valve, mixer and air pump. Discharge the electrolyte (best saved in brown grinding jar) for future use. Clean the electrolytic tank with distilled water. Switch off.  

三、常見故障維修
III. Common Troubleshooting

1、ERR1—熱電偶接反,將連線反過來
1、ERR1—Inversed connection of thermocouple: Inverse the connection.

      ERR2—熱電偶開路,連線斷了或者熱電偶損壞
      ERR2— Open circuit of thermocouple: The connection is broken or the thermocouple is damaged.

      ERR3—可控硅失控,加熱控制元器件固態(tài)繼電器損壞或者其本身損壞
      ERR3— Silicon-controlled rectifier (SCR) is out of control: Solid-state relay of the heating control component is damaged or the heating control component itself is damaged.

      ERR4—可控硅觸發(fā)后沒有加熱電流,一般是硅碳管老化,需更換
      ERR4— No heating current is generated after triggering SCR: Usually because the silicon carbide tube is aged and needs changing.

      ERR5—電解池問題,電解液有問題或者液體太少,或者是電解池?fù)p壞
      ERR5—Problem of electrolytic tank: The electrolyte has a problem or the liquid is too little, or the electrolytic tank is damaged.

      ERR6—送樣卡,送樣棒卡住,皮帶松動(dòng)或者電機(jī)不轉(zhuǎn)
      ERR6—Feeding blocked: The feed bar is blocked, the belt is loose or the motor does not rotate.

      ERR7-送樣器問題,送樣位置檢測元件,霍爾損壞
      ERR7-Feeder problem: The feed position detection Hall element is damaged.

2、凈化器部分氣路引起的實(shí)驗(yàn)結(jié)果做不準(zhǔn)的故障分析
2、Troubleshooting for incorrect experimental result caused by gas circuit of purifier part

 故障原因的幾點(diǎn),凈化器干燥管上端的膠塞和下端的氣咀,是否松動(dòng)或堵塞。電解池的溶板,電解池下端的放液口,二通閥,干燥管和所有的連接膠管都要檢查。
Several causes: Whether the upper rubber plug and lower nozzle of dry pipe of the purifier are loose or blocked. Check the solution plate and the lower discharge outlet of the electrolytic tank, the two-way valve, dry pipe and all connection rubber tubes.

干燥管的變色硅膠要經(jīng)常更換,否則凈化器的流量計(jì)和氣泵進(jìn)水后會(huì)很快損壞。
The allochroic silicagel in the dry pipe shall be replaced frequently, or the flowmeter and air pump of purifier will be damaged soon if any water enters.

漏氣的檢查,分別捏住電解池的左右兩個(gè)接口,看流量計(jì)指示是否會(huì)下降,從而判斷哪部分漏氣
Air leakage check: Pinch the left and right connectors of the electrolytic tank respectively. Observe the flowmeter to see whether its indication drops and determine which part leaks.

例如流量計(jì)指示正常,但發(fā)現(xiàn)溶板沒有氣泡,說明爐體的氣體根本沒有進(jìn)入電解池。一般為電解池膠塞或干燥管膠塞沒有塞緊,
For example: If the flowmeter indication is normal but no bubble is found on the solution plate, it means the gas in the furnace body does not enter the electrolytic tank. It is generally because the rubber plug of electrolytic tank or dry pipe is not tight.

3、當(dāng)儀器結(jié)果出現(xiàn)偏差后的調(diào)整
3、Adjustment of instrument in case of deviation

儀器本身沒有故障,但隨著儀器常年使用、各元器件老化后,測試結(jié)果可能會(huì)有所偏差,這時(shí)就需要重新校正儀器。
The instrument itself has no trouble. However, after being used all year round, the components become aged and the test result may have deviations. Then it is necessary to re-calibrate the instrument.

首先選擇與平時(shí)測試的煤樣硫含量相接近的煤標(biāo)樣來校正儀器,這樣校正結(jié)果更準(zhǔn)確。儀器內(nèi)部的調(diào)整范圍較大為粗調(diào)。面板按鍵的調(diào)整為細(xì)調(diào),但調(diào)整范圍較小,一般盡量調(diào)整內(nèi)部。內(nèi)部通過線路板上的一個(gè)沒有點(diǎn)紅漆的電位器調(diào)整。面板則是修改精度鍵的數(shù)據(jù),按精度鍵,顯示“J”,這是調(diào)整整體系數(shù),范圍是0900~1100之間。“U”是調(diào)整高硫,范圍是109~009之間,109中的1代表的是負(fù)號(hào)的意思,并不是數(shù)值1,切勿搞錯(cuò)。“N”是調(diào)整低硫,范圍同“U”。
First calibrate the instrument using the coal standard sample with similar sulfur content with normally tested coal sample. In this way, the calibration result is more correct. The internal adjustment range of the instrument is large (rough adjustment). While the adjustment range of panel keys is small (fine adjustment), usually adjusting the internal part as much as possible. The internal part is adjusted via a red-paint-free potentiometer on the circuit board. For adjustment of panel, modify the precision data by pressing the precision key (“J”is displayed). This is to adjust the overall coefficient in the range of 0900~1100. When “U” is displayed, it is to adjust high sulfur in the range of 109~009. The 1 of the109 represents negative sign, not the numeric 1. Do not mix it up. When “N” is displayed, it is to adjust low sulfur in the same range as that of “U”.

修正方法:按“精度”鍵調(diào)整顯示到項(xiàng)目,比如U,按數(shù)字鍵輸入數(shù)據(jù),按“確認(rèn)”鍵,按“退出”鍵,修改結(jié)束。
Method of correcting: Press “precision”key to adjust the corresponding item, for example U. Then press numeric keys to input data and press “OK”. After that, press “return”key. The correction is over.

修正過再次做一個(gè)標(biāo)準(zhǔn)樣,看結(jié)果是否已經(jīng)達(dá)到國標(biāo)范圍內(nèi),否則再次調(diào)整

After correction, prepare an additional standard sample to see whether the result meets the national standard range. If not, correct again.

附:全硫的精密度
Attachment: Precision of total sulfur

(此表格出至國家標(biāo)準(zhǔn)GB/T214-2007煤中全硫的測定方法)
(This table is abstracted from GB/T214-2007 Determination of total sulfur in coal.)

 

全硫質(zhì)量分?jǐn)?shù)Mass faction of total sulfur

St--%

重復(fù)性限Repeatability limit

St,ad--%

再現(xiàn)性限Reproducibility limit

St,d--%

≤1.50

0.05

0.15

1.50(不含Not inclusive)~4.00

0.10

0.25

﹥4.00

0.20

0.35

 

聯(lián)系我們 

地址:金山工業(yè)園區(qū)淇山南路85號(hào)
電話:13503928286
郵箱:htyq@hbhtyq.com
郵編:458030

聯(lián)系人:龍經(jīng)理
13939283560
點(diǎn)擊這里給我發(fā)消息
 
加勒比图片区不卡97-超碰在线女人内射-岛国av在线观看视频-91资源网九色国产 | 麻豆成人免费视频一区二区-国产成人av福利资源-丰满老熟妇二区三区-日韩欧美中文字幕热 | 99国产精品欲av在线-国产精品欧美久久久久久-久久综合亚洲鲁鲁五月久久-91精品国产乱码久久久久久久久 | 成人黄色一级av大片在线观看-国产xxxx成人精品免费视频-色综合久久综合久久-激情视频中文字幕色综合 | 国精产品一区一区三区在线播放-av成人资源亚洲精品-久久国产亚洲精品麻豆-久久久久亚洲精品 | 999精品免费视频观看-国产 精品 9999-精品丰满熟妇人妻一区-日韩中文字幕在线成人免费视频 | 17c国产99视频网站一区二区-91精产品一区二区三区-日韩老熟女精品-五月婷婷久久青青 | 国产又粗又爽又黄又猛视频-国产日韩欧美一区二区三区-久久亚洲国产成人影院av-中文字幕人妻不卡在线 | 亚洲第一精品国产麻豆-亚洲精品乱码久久久久久s8-欧美日韩精品中文字幕在线观看-麻豆网站视频在线看 | 激情综合五月激情综合五月65-adn–181被中出的美丽人妻-亚洲天堂网最新地址-91超碰九色porny | 91在线观看短视频-一区二区网站在线观看视频-激情五月一区二区-蜜臀人妻av一区二区三区 | 久色蜜臀一区二区三区-精品亚洲成a人在线观看9-国产精品高潮呻吟久久av嫩-久久热18国产 | 中文字幕亚洲精品乱码-高清不卡二卡三卡四卡无卡-国产综合一区二区三区av-69精品久久久久久久久久久久 | 亚洲av电影av天堂-麻豆成人小视频在线-成人精品视频免费在线观看-国产精品中文字幕有码 | 欧美日韩亚洲国产自拍偷拍-麻豆精品视频免费在线观看-夜夜操夜夜操天天操天天操天天操-韩国黄片姐姐的朋友 | 欧美日韩亚洲综合一区二区三区-伊人久久大香线蕉午夜av一区-91一区二区三区在线免费-久而久视频99精品免费视频 | 久久久久爱看视频视频-日韩亚洲欧美精品第一页-日韩国产精品免费av久久98-激情五月天电影网 | 2020中文字幕在线播放-日韩免费不卡av一区-岛国在线观看av在线观看-乱色熟女综合一区二 | 99re国产成人精品视频-国产成人av自拍网-超碰精品日韩欧美国产-18禁欧美乱大交蜜桃av | 韩日一区中文字幕-国产久久免费在线视频-韩日中文字幕第二页-2012中文字幕视频下载 | 久久草青青在线视频-91色婷婷综合久久久中文-国产一级黄在线观看-又硬又粗又长又大我好想要 | 亚洲av在线播放观看-美日韩在线观看-久久精品久久精品久久39-国产又粗又视频 | 人妻中文字幕观看在线-国产高清一区二区三区四区五区-精品人妻一区二区三区四季av-成人av电影网一区二区 | 91精品国产92久久久-久久极品中文字幕-国产日韩欧美在线视频免费观看-国产乱码一区二区三区免 | 日韩三级伦理片免费看-国产又黄又粗又硬又大又爽的视频-欧美日韩亚洲一区二区三区-人妻中文字幕视频二区 | 69精品人伦一区二区三区-激情五月激情五月婷婷-97精品国产97久久久免费-国产欧美日韩一区二区久久 | 国产乱人妻精品入口了-18国产精品成久久久久三级-久久久久亚洲国产精品女人-欧美日韩一区二区三区电影 | 中文字幕乱码第一页-国产精品久久久久99久久-国产精品久久久久久白浆-精品一区二区三区蜜桃在线 人人妻操人人妻av-2012中文字幕高清手机版-久久人妻人人澡人人妻-五月天丁香婷婷丁香 | 亚洲欧美日韩偷拍一区二区三区-国产欧美另类久久久精品图片-日韩vr欧美vr性视频-麻豆成人版短视频在线观看 | 日韩三级大全在线视频-国产成人99久久精品激情-九一九色视频在线看-国产精品免费看久久久国产 | 精品久久久久中文字幕一区二区-内射中出日韩高清在线播放-少妇熟女一区二区二三区-亚洲久久99精品视频 | 日韩新片网 桃色av 蜜臀av-亚洲人妻熟女一区二区-av中文字幕日韩在线观看-日韩av熟女中文字幕 | 91久久精品在线播放-17分钟视频一区二区三区-91性高久久久久久久-久久久婷婷精品国产亚洲av是什么 | 成人免费午夜一区二区免费-日韩不卡一区二区三区四区-97久久国产精品-国产精品9999久久久久久久 91精品国产91久久久久-精品少妇的一区二区三区四区-欧美日韩一级片网址-精品久久久久久99精品免费 | 秋霞成人午夜鲁丝一区二区三区-97超在线免费视频网站看-91大神视频免费在线播放-68精品人妻一区二区三区 | 亚洲熟女黄网站色视频-97色婷婷成人综合在线观看-91精品人妻一区二区六十路-999精品免费网站 | 久久精品成人亚洲拍拍拍网站-久久综合色.婷婷综合-麻豆日本性感美女在线视频-91成人在线观看免费高清 | 日本aⅴ精品一区二区三区久久-日韩美女后入式在线视频-久久久久久久久久久熟女av,亚洲午夜精品-日韩 中文字幕在线观看 | 91老熟女最新视频-在线免费观看麻豆久久久黄片-日韩av一二三区中文字幕-久久久久久精品国产综合 蜜臀久久99精品观看-国内成人自拍视频网-成人久久内射人妻-日韩激情小说av电影网 | 日韩丰满人妻一卡二卡-国偷自产中文二区三区-91大神精品视频全集在线播放-亚洲日本成人三级少妇 国产精品黄页网站在线播放免费-日韩三级在线免费看-狠狠做深爱婷婷喷水久久综合一区-国产97成人亚洲综合在线观看 | 5566中文字幕在线-婷婷97狠狠香蕉-女人体内射精一区二区三区-天天综合色天天综合网 |